Skip to content
Projects
AnswersInsights
Get a Quote
020 7864 7245WhatsApp

Quick Answer

What Is a Heritage Statement for a London Listed Building Application?

Heritage Statement assesses significance of heritage asset + impact of proposed works + mitigation for listed building + conservation area applications. Required by NPPF para 200 + most London Local Plans for any heritage-affecting application. Cost £650–£2,850 by IHBC-accredited heritage consultant. Includes: significance assessment, impact analysis, alternatives considered, mitigation, conclusion.

Free · No obligation

Get your free quote

A senior consultant calls within one business hour.

No spam. Your details are never sold.

01

Policy basis + when required

National Planning Policy Framework (NPPF) para 200: 'In determining applications, local planning authorities should require an applicant to describe the significance of any heritage assets affected, including any contribution made by their setting.' Required for: applications for Listed Building Consent (always); applications affecting setting of listed building; applications in conservation areas (most London boroughs); applications affecting locally listed (non-designated) heritage assets; applications affecting registered parks + gardens; applications affecting scheduled monuments. Westminster, Kensington and Chelsea, Camden, Hackney, Islington all routinely require Heritage Statement for any extension/alteration in CA.

02

Content + structure

Standard structure per Historic England Good Practice Advice Note 2 ('Managing Significance in Decision-Taking in the Historic Environment'): (1) Introduction — building/site address, listing grade, conservation area; (2) Historic context — historical development of building + area, dating evidence, prior alterations; (3) Significance assessment — architectural, historic, archaeological, artistic interest per Historic England values; significance graded (high/medium/low/intrusive); (4) Description of proposals; (5) Impact assessment — proposal impact on each significant element; (6) Mitigation — design changes reducing harm; (7) Alternatives considered + rejected; (8) Public benefits; (9) Conclusion — balancing harm vs benefit. Length 8–25 pages typical with photos + plans + historic maps + archive research. NPPF tests: 'substantial harm' (paragraph 200 — exceptional justification required) vs 'less than substantial harm' (paragraph 202 — public benefit balance).

03

Cost + consultant

IHBC-accredited heritage consultant required for credible Heritage Statement. London specialists: Donald Insall Associates, Alan Baxter Associates, Purcell, Heritage Collective, Built Heritage Consultancy. Cost: simple householder LBC £650–£1,250; moderate (multi-room intervention) £1,250–£2,500; complex (Grade I/II* or significant Grade II) £2,500–£8,500. Builderr maintains relationships with 2 consultants (SPAB + IHBC accredited) — typical fee structured as fixed-price + photo survey + 1 site visit + 2 rounds amendments. Heritage Statement often determines application outcome — investing in quality consultant pays back in approval + reduced amendment cycles.

More questions

Related questions answered.

Can my architect write the Heritage Statement?

+

Possible if architect is IHBC-accredited or has heritage expertise. Most general practice architects do not have heritage credentials — Historic England + conservation officers prefer accredited consultant. Combined architect + heritage consultant team standard for listed building work.

What is 'significance'?

+

NPPF defines as 'value of a heritage asset to this and future generations because of its heritage interest — may be archaeological, architectural, artistic or historic.' Heritage Statement breaks down significance by element (façade, plan form, joinery, ceiling plaster, etc.) + grades each — informs which interventions acceptable + which constitute harm.

How long does Heritage Statement take to prepare?

+

Typically 3–6 weeks: 1-week archive research + site visit; 2-week drafting; 1-week client review + amendments; 1-week finalisation. Plan into pre-submission timeline accordingly.

Ready to get started?

Senior consultant call within one business hour. Free desk-based planning assessment. Fixed-scope quote — no provisional sums, no day-rate creep.