What is included in a bathroom renovation cost?
A turnkey London bathroom renovation includes strip-out and disposal of existing fixtures and finishes, soil pipe and waste reconfiguration if needed, hot and cold water re-routing, electrical first and second fix including extractor and lighting, plasterwork, full waterproofing under tile (tanking), wall and floor tiling, sanitaryware (WC, basin, bath or shower), brassware (taps, shower controls, valve), vanity unit, mirror, accessories, decoration to ceilings and any non-tiled walls, and final cleaning. Optional and quoted separately on most jobs: underfloor heating (£800-£1,800 fitted on a 4-6m² floor), heated towel rail (£250-£900), bespoke joinery vanity (£1,500-£4,000 vs £400-£900 stock), full-pane glass shower screens (£600-£1,800), niche shelves cut into walls (£300-£600 each), and structural changes to enlarge the room.
Cost by bathroom tier
Three tiers cover most London bathroom refurbishments. Entry-level (£8,500-£14,000): mid-market Roca, Twyford or Ideal Standard fixtures, porcelain wall and floor tiles £25-£45/m², standard chrome brassware, stock vanity, no underfloor heating. Mid-range (£14,000-£22,000): Hansgrohe, Crosswater or Aqualisa brassware and showers, full-height porcelain or ceramic tiling £45-£90/m², underfloor heating, larger format tiles, stone resin shower trays, custom-cut vanity. Premium (£22,000-£32,000+): natural stone tiles £120-£300/m², brass or copper fittings (Drummonds, Burlington, Lefroy Brooks), bespoke joinery vanity, walk-in steam shower, Smart heating controls, mood lighting circuits. Above £32,000, bathrooms overlap with spa-grade master suite builds where structural enlargement, Hammam-style finishes and high-end stone push costs to £60,000-£100,000.
What drives bathroom cost variance?
Tile choice is the single biggest variable: ceramic at £25/m² versus marble at £250/m² creates an £2,000-£4,000 swing on the same footprint. Brassware bracket is second: a complete Roca brassware set (taps, shower, valve, waste) runs £400-£700; the same set in Hansgrohe Axor or Vola is £2,400-£3,800. Layout change (moving WC, swapping bath for walk-in shower) adds £1,500-£3,500 in waste reconfiguration and re-tile. Underfloor heating adds £900-£1,800 fitted. Bespoke joinery vanity replacing stock unit adds £1,200-£3,500. Always price a fixed-scope bathroom against a written specification — most disputes arise from PCs on tile and brassware where allowances are quoted at entry-level prices but real selections sit one or two tiers up.
Realistic London timelines
On-site duration for a standard bathroom renovation in London is 12-18 working days for a like-for-like swap, 18-28 days for layout reconfiguration including new waste runs, and 28-40 days for full reconfigurations involving structural work or master ensuite enlargement. Tiling alone consumes 3-7 days depending on tile size, pattern and substrate prep. Plan total project duration including specification, ordering and lead times of 8-14 weeks. Lead times for ordered fixtures and bespoke joinery routinely exceed site duration — order everything before site start and store at the contractor's premises to avoid mid-build delays.