Projects
Recent London builds.
Real projects, real numbers. Every case study shows actual cost, programme and outcome — including snag count at handover and resale value uplift where measured.
L-shape loft + master suite
Wandsworth · Victorian terrace · 12-week build
Side return kitchen extension
Hackney · Edwardian terrace · 11-week build
Mansard above Georgian terrace
Camden · Grade II adjacent · 15-week build
Hip-to-gable + double dormer
Ealing · 1930s semi · 13-week build
Double-storey extension
Richmond · Detached family home · 19-week build
Mansard master suite
Islington · Conservation area · 14-week build
Garden-linked basement conversion
Kensington · Stucco-fronted terrace · 26-week build
Integrated garage to home office
Brent · 1950s semi · 7-week build
L-Shape Loft Conversion, Hackney Victorian Terrace
Two bedrooms and family bathroom under a natural slate dormer, woven into a conservation-area roofscape.
Side-Return Extension, Wandsworth Edwardian Terrace
A dark galley kitchen opened into a 32 sqm kitchen-diner with a structural rooflight and full-width garden link.
Mansard Loft, Camden Grade-II Listed Terrace
A traditional Camden mansard delivering a master suite and study within Conservation Area constraints — full planning and Listed Building Consent secured first time.
Double-Storey Side Extension, Ealing Edwardian Semi
A 44 sqm double-storey side extension delivering a family kitchen-diner downstairs and master suite upstairs on a 1908 Ealing semi.
Spitalfields warehouse flat — heritage-led full renovation
Tower Hamlets · E1 · Grade II conservation area · 14-week build
Side return + L-shape loft, Clapham Old Town
Lambeth · SW4 · Clapham Old Town Conservation Area · 22-week build
Riverside Edwardian whole-house renovation
Richmond · TW10 · Petersham Conservation Area buffer · 32-week build
Side return + double-storey extension
Greenwich · SE3 · Blackheath Conservation Area · 24-week build
Double-storey rear extension on Edwardian terrace
Hammersmith and Fulham · W6 · Brackenbury Village Conservation Area · 26-week build
Stucco facade restoration + interior LBC works
Kensington and Chelsea · SW7 · Grade II listed · 38-week build
Shoreditch warehouse mezzanine + roof terrace
Tower Hamlets · Warehouse conversion · 22-week build
Clapham double-storey side return + L-shape loft
Lambeth · Victorian terrace · 28-week build
Peckham Rye mansard loft + whole-house renovation
Southwark · Victorian terrace · 30-week build
Forest Hill side return kitchen-diner
Lewisham · Victorian terrace · 18-week build
Muswell Hill Edwardian Double-Storey Side Return
Edwardian villa, side return + first-floor over, low-carbon retrofit
Queen's Park Victorian Side Return + Whole House
Victorian terrace, side return kitchen, dormer loft, full M&E rewire
Purley 1930s Double-Storey Side + Rear Extension
1930s semi, double-storey side, single-storey rear, open-plan reno
Hampstead Garden Suburb rear extension + heritage sash restoration
Barnet · 1909 Lutyens-influenced semi · NW11 · CA + HGS Trust controls
Chislehurst 1930s detached double-storey rear + loft
Bromley · 1934 detached · BR7 · large rear garden, no CA
Surbiton side return + sash restoration
Kingston upon Thames · 1898 Victorian end-of-terrace · KT6 · Surbiton CA
Bedford Park wraparound + heritage restoration
Hounslow · 1888 Norman Shaw garden suburb · W4 · Bedford Park CA Article 4
Full-insulated garden studio
Wandsworth · Screw pile · 5-week build
Conservation area orangery dining room
Camden · Victorian terrace · 10-week build
Double-storey rear + mansard loft, Clapton
Hackney · 1895 Victorian terrace · E5 · 20-week build
Prior approval open-plan rear extension
Enfield · 1930s semi-detached · N13 · 10-week build
Hip-to-gable loft + ASHP & solar, Wimbledon
Merton · 1935 semi-detached · SW19 · 14-week build
Walthamstow Village side return kitchen, heritage CA
Waltham Forest · 1880s Victorian terrace · E17 · 12-week build
Grade II listed full renovation, Pimlico
Westminster · 1840s Georgian terrace · SW1V · 22-week build
Double-storey side extension, Stratford
Newham · 1952 post-war semi-detached · E15 · 16-week build
Hip-to-gable loft + rear dormer
Harrow · 1930s semi-detached · 10-week build
Rear extension + attic room
Sutton · 1950s bungalow · 13-week build
Double-storey rear extension, Seven Kings
Redbridge · 1952 semi-detached · IG3 · 14-week build
Rear extension + full ground-floor renovation, Becontree
Barking and Dagenham · 1932 terrace · RM8 · 12-week build
Double-storey side extension, Sidcup
Bexley · 1933 semi-detached · DA15 · 18-week build
Rear extension + dormer loft conversion, Ruislip
Hillingdon · 1936 detached · HA4 · 22-week build
Grade II Georgian whole-house heritage restoration, Canonbury
Islington · 1825 Grade II Georgian terrace · N1 · 28-week build
Victorian terrace period-features restoration + side return extension, Tooting
Wandsworth · 1888 Victorian terrace · SW17 · 24-week build
Broken-plan kitchen-diner-snug + rear extension, Crouch End
Haringey · 1908 Edwardian semi · N8 · 16-week build
Double-storey side extension + loft conversion, Winchmore Hill
Enfield · 1934 semi-detached · N21 · 18-week build
Wraparound side-rear extension + dormer loft, Romford
Havering · 1962 semi-detached · RM2 · 20-week build
Listed Barbican Estate flat renovation, EC2Y
City of London · Grade II Barbican Estate flat · EC2Y · 16-week build
1970s detached deep retrofit — ASHP + MVHR + EPC F→A, KT2
Kingston upon Thames · 1972 detached · KT2 · 24-week build
Edwardian rear garden full landscape — Renson bioclimatic + porcelain terrace, N14
Enfield · Edwardian semi rear garden · N14 · 14-week landscape
1930s semi rear extension + loft + energy retrofit, W5
Ealing · 1934 mock-Tudor semi · W5 · 26-week build
Listed Georgian townhouse whole-house restoration, SE3
Lewisham · Grade II Georgian terrace · SE3 · 32-week build
Edwardian period restoration with ASHP + MVHR, BR2
Bromley · 1906 Edwardian semi · BR2 Shortlands · 22-week build
1968 detached deep retrofit — EnerPHit, EPC G→A+, net energy positive
Harrow · 1968 detached · HA7 Stanmore · 28-week build
Victorian terrace converted to two self-contained flats, E16
Newham · Victorian terrace · E16 Canning Town · 26-week build
Victorian side return + L-shape loft, South Norwood Conservation Area
Croydon · 1893 Victorian mid-terrace · SE25 · 20-week build
Carshalton Village Victorian terrace heritage restoration, SM5
Sutton · 1881 Victorian mid-terrace · SM5 Carshalton Village CA · 24-week build
1962 detached EnerPHit-grade deep retrofit, Coombe KT2
Kingston upon Thames · 1962 detached · KT2 Coombe · 30-week build
Highgate Edwardian circular-economy retrofit
Haringey · 1908 Edwardian terrace N6 · 22-week build · WLCA + reclaimed materials + low-carbon spec
Pimlico mansion-block flat fire-safety + heritage refurbishment
Westminster · Grade II mansion block SW1V · 18-week build · BSA dutyholder regime + FD60S fire doors + heritage retention
Victorian terrace + KNX smart home + circadian lighting, Balham SW12
Wandsworth · 1898 Victorian terrace · SW12 Balham · 24-week build
Edwardian semi + rainwater harvesting + microcement kitchen, Wanstead E11
Redbridge · 1908 Edwardian semi-detached · E11 Wanstead · 22-week build
Enforcement appeal win — 1930s rear extension immunity confirmed
Enfield · 1932 mid-terrace · enforcement notice quashed + CLEUD issued
Householder appeal win — refused mansard loft in CA approved on appeal
Brent · 1885 Victorian terrace · Kilburn CA · HAS appeal allowed first-time
Ex-pub conversion — Brixton ACV-listed corner pub to 4 self-contained flats
Lambeth · 1894 corner public house · ACV + Sui Generis to C3 · 9 flats refused, 4 approved
Ex-chapel conversion — 1862 Bermondsey Wesleyan chapel to single family home
Southwark · Grade II listed Wesleyan chapel · Sui Generis to C3 single dwelling · LBC + CA + Article 4
Ex-warehouse conversion — 1898 Dalston printworks to 4 residential flats
Hackney · 1898 Victorian printworks · B8 storage to C3 residential × 4 · CA + Article 4
C3 to 6-bed HMO sui generis — Walthamstow Victorian conversion + Article 4 planning win
Waltham Forest · Victorian terrace · C3 → sui generis HMO planning under Article 4 + mandatory HMO licence + design 12% above borough HMO standards
Class MA office → 12 flats — Brentford 1980s office conversion + Article 4 boundary win
Hounslow · 1,180m² Class E office → C3 prior approval + 12 NDSS-compliant flats + Class A.1 rear extension + light well excavation
Class G shop-with-flat → 2 flats — Bermondsey Victorian mixed-use conversion + maisonette extension
Southwark · Victorian terraced High Street · Class G ground-floor Class E shop → C3 1-bed flat + retained upstairs C3 flat extended into rear addition
Edwardian broken-plan kitchen renovation — Plain English in-frame + Calacatta island
Richmond upon Thames · TW1 Twickenham · Edwardian villa · 11-week build
Victorian master ensuite + family bathroom retrofit — Drummonds + Lefroy Brooks
Hammersmith and Fulham · SW6 Parsons Green · Victorian terrace · 7-week build
Grade II listed Hampstead master suite — Calacatta marble + LBC heritage retrofit
Camden · NW3 Hampstead · Grade II Georgian townhouse · 14-week build
Highbury Victorian terrace — master ensuite carve-out + family bathroom paired retrofit
Islington · N5 Highbury Fields · Victorian terrace · 8-week build
1934 mock-Tudor semi — integral garage → bedroom + ensuite + utility (PD route)
Ealing · W5 Pitshanger · 1934 mock-Tudor semi · 7-week build
1928 detached garage → self-contained 1-bed annexe with kitchenette + shower room
Richmond upon Thames · TW1 St Margarets · detached garage outbuilding · 11-week build
Georgian whole-house renovation — Maritime WHS buffer
Greenwich · 1798 Grade II Georgian terrace · 32-week programme
Victorian whole-house renovation — Heaver CA broken-plan
Wandsworth · 1892 Heaver CA terrace · 28-week programme
Victorian side-return + rear kitchen extension — Parsons Green CA
Hammersmith and Fulham · 1889 Parsons Green CA terrace · 14-week build
Victorian side-return + rear kitchen extension — Bow Article 4 CA
Tower Hamlets · 1885 Bow CA terrace · 12-week build
Ground-floor structural opening + twin chimney-breast removal
Lambeth · 1891 Clapham Old Town terrace · 9-week build
Grade II Georgian structural alteration with LBC + heritage propping
Islington · 1832 Grade II Canonbury terrace · 16-week build
W11 stucco terrace full-house basement with lap pool, cinema and wine cellar
Kensington & Chelsea · 1854 stucco terrace · 38-week basement build
NW3 Belsize Park Victorian semi basement conversion with rear lightwell and bedroom suite
Camden · 1882 Belsize Park CA Victorian semi · 24-week basement build
W11 Notting Hill Grade II stucco terrace mansard with full LBC
Kensington and Chelsea · 1853 Grade II stucco terrace · 18-week mansard build
W1 Marylebone Edwardian mansion-block penthouse mansard with BSA HRB Gateway 2 + Licence to Alter
Westminster · 1906 mansion-block penthouse · 22-week mansard build + 18-month consent ladder