Skip to content
Projects
AnswersInsights
Get a Quote
020 7864 7245WhatsApp
Enfield · N21 · 2026

Double-storey side extension + loft conversion, Winchmore Hill

Enfield · 1934 semi-detached · N21 · 18-week build

Project cost
£145,000
Site programme
18 wks
Type
House Extension
Year
2026

Free · No obligation

Get your free quote

A senior consultant calls within one business hour.

No spam. Your details are never sold.

Brief

A 1934 semi-detached house on a leafy street in Winchmore Hill, Enfield — N21, not in a conservation area. The property: 96m² original (3 bedrooms, 1 bathroom, narrow corridor kitchen, integrated half-side garage). The brief: maximum value-add renovation transforming the property from a typical 3-bed inter-war semi into a 4-bed-2-bath modern family home. Three interventions: (1) double-storey side extension over and replacing the integrated garage; (2) hip-to-gable loft conversion with rear dormer creating master suite; (3) full ground-floor reconfiguration to open-plan kitchen-diner-utility. Combined effect: floor area 96m² → 175m²; bedrooms 3 → 4; bathrooms 1 → 2. The clients had a fixed budget of £150,000 (achieved £145,000 outturn) and a target sale price of £950,000 within 3 years.

Challenge

Multi-intervention scope required careful sequencing. Side extension over the existing garage required structural intervention — original garage walls were single-skin breeze block (no foundations adequate for first-floor loading); demolition and rebuild on new strip foundations to 0.9m depth on London Clay. Mock-Tudor first-floor gable: planning required the new first-floor extension to match the existing host property's mock-Tudor character — sourcing matching timber and arranging custom render finish required specialist craftsman. Hip-to-gable loft: roof structure had to be re-formed (original 1934 hip removed, new gable end in matching brick); rear dormer added under PD. Ground-floor open-plan: original layout had three separate rooms with one identified as load-bearing supporting first-floor wall above. Structural engineer specified 4.5m UB 254×146×31 steel beam with twin pad-stones. Party Wall: Section 6 notice served to attached neighbour; excavation within 3m of attached neighbour's foundation; Agreed Surveyor route; Award sealed in 4 weeks.

Solution

Planning: full planning application (side extension over former garage triggers full planning per Enfield local plan); granted 8 weeks first-time. Loft conversion separately progressed under Prior Approval. Structural: side extension ground-floor (3m × 5m) on strip foundations 0.9m depth, cavity brick to red-brick match (sourced via Ibstock); first-floor (3m × 5m) timber-frame construction with red brick outer leaf + mock-Tudor render to gable; 4.5m UB 254×146×31 steel beam internal opening for ground-floor. Loft: hip-to-gable on the attached-neighbour-side; rear dormer (5m × 3m, EPDM flat roof, 3 Velux); new staircase rising over existing landing. Ground floor reconfiguration: 4.5m UB steel installed; original wall demolished; existing 35m² of three rooms + new 15m² side extension = 50m² combined open-plan kitchen-diner-utility. Mock-Tudor restoration: salvage timber sourced from a Hertfordshire demolition (matched 1930s oak boards); custom render finish in matching colour (Crown Marble Finish + iron oxide pigment); result: indistinguishable from original from street view. Sash windows on host property: 6 windows restored with slim DG retrofit; new side-extension windows specified as matching profile. Master suite (loft): 16m² master bedroom with rear-dormer dual-aspect glazing; 5m² en-suite (compact wet-room style with frameless shower); 4m² walk-in wardrobe (built-in oak veneer joinery, full ceiling height). Kitchen: 6m galley arrangement + 3m island in painted-MDF Farrow & Ball Card Room Green with brass handles. EV charger: 7kW Hypervolt on forecourt.

Outcome

Floor area added: 79m² (side extension ground 15m² + side extension first-floor 15m² + loft 24m² + reconfigured ground-floor footprint gain 25m² net). Property: 96m² → 175m² — 82% increase. Bedrooms: 3 → 4. Bathrooms: 1 → 2. EPC: D (61) → B (84) — full rewire and new combi boiler; CWI; loft insulation 270mm; double glazing throughout. Build 18 weeks. Enfield Building Control completion certificate issued at week 19. Estate agent post-completion valuation £935,000 — within £15,000 of client's target. Original purchase (2021) £675,000 + £145,000 spend = £820,000 invested; comparable post-renovation 4-bed semi in Winchmore Hill sold for £945,000 same month.

Spec

Project specification.

Side extension
Double-storey 3m × 5m — ground floor open-plan kitchen-diner; first floor en-suite bedroom; matched red brick + mock-Tudor render to first-floor gable
Loft conversion
Hip-to-gable + rear dormer (5m × 3m EPDM) — 24m² master bedroom, en-suite, walk-in wardrobe
Ground floor
Three rooms (35m²) + new side extension (15m²) merged to 50m² open-plan — 4.5m UB steel beam
Mock-Tudor restoration
Salvage 1930s timber half-timbering + colour-matched render finish — replicated existing host gable
Bedrooms
3 → 4; bathrooms 1 → 2
EPC
D (61) → B (84) — CWI + loft upgrade + slim DG + new combi boiler
Planning
Full planning (side ext over garage); loft Prior Approval — both 8 weeks first-time
Party Wall
S.6 notice to attached neighbour; Agreed Surveyor; Award sealed 4 weeks
Programme
18 weeks build, 26 weeks total

Gallery

Inside the build.

Double storey side extension 1934 semi Winchmore Hill N21 Enfield
Double-storey side extension — matched red brick, mock-Tudor first-floor gable continued from host property
Open plan kitchen diner side extension Winchmore Hill Enfield N21
Ground-floor side extension: open-plan kitchen-diner-utility (38m²) with bifold to south-facing garden
Hip to gable loft conversion master suite Winchmore Hill
Hip-to-gable loft conversion with rear dormer — master bedroom + en-suite + walk-in wardrobe

"We bought this house knowing it needed everything. Three years on, it's transformed. The mock-Tudor matching on the new side extension is so good our neighbours assumed we'd 'just restored' the front. The hip-to-gable loft gave us the master suite we wanted; the open-plan ground floor gave us the family kitchen we wanted. Builderr stuck within budget and within programme."

— Priya and Tom Sutherland, Winchmore Hill N21

Compare

Builderr vs other London builders.

The construction industry has a wide distribution of operators. Here's what changes between a directly-employed, fixed-scope outfit and the alternatives.

Builderr fixed price
£145,000
a house extension · no provisional sums
Typical builder + variations
£174,000
+£29,000 vs Builderr (≈20% overrun)
Cowboy outfit + cost creep
£210,250
+£65,250 vs Builderr (≈45% overrun)
CriterionBuilderrTypical London builderCowboy outfit
Labour modelDirectly employed team (PAYE)Mixed subcontract gangsDay-rate cash labour
PricingFixed-scope itemised quoteEstimate + provisional sumsVerbal price + variations
Design & engineeringIn-house architect + SEOutsourced, separate billingBuilder draws on the back of an envelope
Planning + LDC handledYes — included in priceOften charged extraBuilder asks you to apply
Party wall surveyorsInstructed by usYour responsibilitySkipped (illegal)
Building controlPlans + site inspections booked by usBuilding Notice routeNot registered
Project managementDedicated PM, weekly photo updatesForeman doubles upOwner-manager juggles 5 jobs
Payment scheduleStage payments against signed-off milestonesWeekly invoicesCash up front
Insurance£10M PL + 10yr structural warranty£2–5M PL onlyNo documented cover
Snags at handover<3 typical20–30 typicalWalk-off mid-job common
Variation creep0% — fixed scope+15–25% over original quote+40%+ regularly
Bottom line

Save £29,000–£65,250 on a house extension.

Industry data (FMB, RICS, Which? Trusted Trader 2024) shows the average London construction project overruns by 18–22% on cost and 25–35% on time. Fixed-scope contracts with a single accountable team eliminate that variance. The savings above assume a typical project at £145,000.

Want a build like Enfield?

Get a fixed-scope quote with the same direct-labour delivery. Senior consultant call within one business hour.

Related services