Pimlico mansion-block flat fire-safety + heritage refurbishment
Westminster · Grade II mansion block SW1V · 18-week build · BSA dutyholder regime + FD60S fire doors + heritage retention
Brief
1908 Edwardian mansion block flat SW1V Pimlico — Grade II listed (group listing — block listed as ensemble) — 116m² 2nd-floor flat in 6-storey block (18.2m height — Higher Risk Building under BSA 2022). Owners (corporate-law partner + barrister, 1 child) brief: full flat refurbishment retaining all heritage character (original cornice 96m run, 6 original sash windows, original panelled doors throughout, original parquet ground floor, original cast-iron fireplaces × 3) AND meeting current fire safety standards under Building Safety Act 2022 (block is HRB — Accountable Person consent + dutyholder regime + golden thread + FD60S flat front door + restored fire compartmentation). 4 bedrooms + 2 bathrooms + open-plan kitchen-living + study. Listed Building Consent required (Grade II group listing) + Westminster Conservation Area + Accountable Person consent + Building Regs full plans approval via private Building Control Approver (Sweco). Builderr first project navigating BSA dutyholder regime on HRB-resident flat.
Challenge
Six compounding constraints. (1) HRB status — block 18.2m height + 6 storeys + 24 dwellings = Higher Risk Building under BSA 2022. Accountable Person consent (managing agent Savills + Pimlico Mansion Block RTM Ltd) required before any work affecting compartmentation or façade. Internal-only cosmetic refurbishment outside Gateway 2 scope but full BSA dutyholder regime (Principal Designer + Principal Contractor competence + golden thread documentation) applied. (2) Grade II group listing — every original element fabric protected; LBC required for any alteration to historic fabric. Westminster heritage officer + Historic England consultation route. Heritage Statement by Donald Insall Associates. (3) FD60S flat front door — BSA 2022 mandates FD60S for flat doors in HRBs. Original Edwardian 6-panel painted door 38mm thick — incapable of meeting FD60S as standard. Solution: retain original door + intumescent paint inner face + Lorient intumescent edge seals + smoke seal + Briton 2003 concealed self-closer + Fire Engineer (Hoare Lea) report certifying FD60S equivalence — accepted by Building Control + Accountable Person + LBC. (4) Fire compartmentation restoration — block built 1908 pre-modern compartmentation; numerous service penetrations (post-war electrics + 1960s rewire + 1990s plumbing) compromised 60-minute compartment integrity. Full audit of all service penetrations through party walls + floors + restoration with Hilti CFS firestop system by FIRAS-certified installer — 47 penetrations identified + sealed. (5) Heritage joinery + cornice retention during deep services strip-out — original cornice 96m run + plaster ceiling roses × 4 + original parquet → retained while new electrics + plumbing + MVHR ducting threaded through. Cornice-friendly cable routes via skirting voids + chimney breasts; bespoke MVHR ductwork hidden in dropped-ceiling bulkheads sympathetic to room geometry. (6) Sash retention vs energy + acoustic — 6 original sash windows fronting Pimlico CA — LBC prohibited replacement. Selectaglaze Series 10 secondary glazing added internally + sashes restored (Ventrolla service); achieved U-value 1.8 → 1.1 W/m²K + 38dB acoustic improvement (Pimlico Road traffic noise decisive renovation driver).
Solution
Pre-design + consents 22 weeks. Heritage Statement (Donald Insall Associates, IHBC-accredited) + Design + Access Statement + Fire Strategy (Hoare Lea fire engineers) + Accountable Person consent letter (Pimlico Mansion Block RTM Ltd) + BSA dutyholder appointments (Builderr as Principal Contractor + Donald Insall architecture as Principal Designer in writing) weeks 1–6. Heritage + LBC consultation pre-app with Westminster Heritage Team weeks 4–8; full LBC + planning submission week 10; approved week 22 zero amendments. Sweco Building Control Approver engaged + full plans approval week 16 (parallel with LBC). Build 18 weeks. Strip-out weeks 1–3: careful protection of cornice (boxed plywood guards), ceiling roses (timber tents), parquet (Hardie board overlay + breathable membrane), sashes (taped + boxed); 5-bin waste sort achieving 84% landfill diversion. Compartmentation audit weeks 2–4: Hoare Lea fire engineer + Builderr surveyed all 47 service penetrations through party walls + party floor; Hilti CFS firestop system installed by FIRAS-certified subcontractor (Compartmentation Limited) — intumescent collars to plastic pipe penetrations × 12, cementitious batt to large cable tray openings × 4, intumescent mastic to small gaps × 31; photographic record + product certificate per penetration retained in golden thread file. Fire door retrofit weeks 5–6: Envirograf E-FFI intumescent paint to inner face of original front door (3 coats spray-applied, dft 1.2mm achieved); routed grooves to all 4 edges + Lorient intumescent strip insert + Lorient brush smoke seal; new fire-rated cylinder + 3-point mortice lock; Briton 2003 concealed overhead self-closer; threshold cold smoke seal; Hoare Lea Fire Engineer assessment report certifying FD60S equivalence per BS EN 1634-1 testing principles; accepted by Sweco Building Control + Pimlico Mansion Block RTM Ltd. Sash + window restoration weeks 6–10: Ventrolla sash restoration (6 windows — strip + repair joints + new pulleys + Pre-form draught-strip); Selectaglaze Series 10 secondary glazing (slimline aluminium frames, 6mm acoustic glass, 100mm cavity from primary sash, opening hopper for cleaning + ventilation control). Services weeks 7–14: full rewire (cable in skirting voids + chimney breasts to avoid cornice damage); full re-plumb (PEX in floor voids, runs along original joist directions to avoid compartmentation re-piercing); MVHR Zehnder ComfoAir Q150 sized for 116m² (semi-rigid 90mm ducting in dropped-ceiling bulkheads following room geometry); UFH ground floor only (parquet retained — UFH below new floor build-up to study + kitchen-living only, retains heritage parquet to bedrooms + hall as-is). Kitchen + bathrooms weeks 13–16: deVOL kitchen (mechanically fixed, demountable); Drummonds heritage sanitaryware (3 reclaimed cast-iron baths + brass taps); travertine flooring to bathrooms. Heritage finishes weeks 14–18: cornice repair (12m of damaged sections replicated in-situ by Hayles & Howe, matched to original 1908 profile); 4 reclaimed Victorian cast-iron fireplaces retained + relined; Edward Bulmer natural paint throughout (12 colour palette by Donald Insall heritage colour scheme — historic earth tones); parquet repair + sand + traditional wax (Liberon Bee's Wax). Final inspections week 18: Building Control completion certificate; LBC completion + photo evidence; Accountable Person fire safety + golden thread sign-off (47 firestop certificates + 1 fire door certificate + as-built drawings + product spec sheets + Fire Engineer report all in digital golden thread file).
Outcome
Grade II + HRB compliant refurbishment — first Builderr project under BSA 2022 dutyholder regime + first to combine FD60S retrofit + full compartmentation restoration + heritage retention on a single flat. Accountable Person + Sweco Building Control + Westminster LBC + Westminster CA + Donald Insall heritage consultant all signed off. Heritage: 96m cornice + 4 ceiling roses + 3 cast-iron fireplaces + 6 sash windows + original parquet hall + 12 original panelled internal doors all retained + restored. Fire safety: 47 service penetrations firestopped (Hilti CFS system, FIRAS-certified install, certificate per penetration); flat front door upgraded to FD60S-equivalent by Hoare Lea Fire Engineer report (original 1908 door retained); golden thread digital file (drawings + calcs + certificates + product data + manuals + Fire Engineer report + Accountable Person consents) handed to client + Accountable Person. Acoustic: Pimlico Road traffic noise reduced 38dB at glazing; bedroom internal background noise dropped from 44dB(A) → 28dB(A) (measured pre + post — Hoare Lea). Energy: EPC F (32) → D (62) — constrained by LBC retention of original sashes; secondary glazing + MVHR + heritage-compatible interventions only. Operational heating cost £4,200/year (gas boiler retained — listed block restricts ASHP at this stage; replacement planned at block-wide programme) → £2,800/year (MVHR + window upgrade combined). Property valuation pre-renovation £2.4M → post-renovation £3.2M (£800k uplift on £168k spend = 376% gross ROI — exceptional Westminster mansion-block premium). Featured: AJ Retrofit Awards 2026 shortlist (Heritage + Fire Safety category); Donald Insall case study publication; FIRAS member-of-the-year project nomination (Compartmentation Limited subcontractor). Westminster borough now 3 portfolio case studies; Pimlico SW1V first project under BSA dutyholder regime. Builderr first BSA-dutyholder-regime HRB project — opens flat-refurbishment workstream in HRB inventory (~5,000 London buildings).
Spec
Project specification.
Gallery
Inside the build.
"We bought a Pimlico Grade II mansion-block flat in a building everyone tells you is the worst possible refurbishment scenario — Grade II group-listed, Higher Risk Building under BSA 2022, Accountable Person consent required, Westminster Conservation Area, FD60S fire door mandate, 1908 service infrastructure compromised on every compartmentation line. Most contractors quoted with caveats about scope creep or refused to engage with the HRB regime at all. Builderr presented a clear plan: Donald Insall as Principal Designer, Builderr as Principal Contractor with written BSA dutyholder appointments, golden thread digital file from day one, Hoare Lea as fire engineer authoring the FD60S equivalence report for the original front door (which we wanted to keep), Compartmentation Limited as FIRAS-certified firestop subcontractor sealing 47 service penetrations with certificate-per-penetration evidence. The original door is FD60S compliant by intumescent retrofit and Fire Engineer report — Westminster, Sweco BCA, the RTM Accountable Person, and our insurers all signed it off. 96 metres of original cornice retained. 6 sash windows restored with Selectaglaze secondary glazing achieving 38dB attenuation against Pimlico Road traffic — our daughter sleeps through ambulance sirens for the first time. £168k spend added £800k to valuation. The golden thread file Builderr handed over is the document the Accountable Person now wants every leaseholder in the block to use as the template. We are referring three neighbours in the building."
— James + Eleanor Fitzgerald-Brennan, Pimlico SW1V
Builderr vs other London builders.
The construction industry has a wide distribution of operators. Here's what changes between a directly-employed, fixed-scope outfit and the alternatives.
| Criterion | Builderr | Typical London builder | Cowboy outfit |
|---|---|---|---|
| Labour model | Directly employed team (PAYE) | Mixed subcontract gangs | Day-rate cash labour |
| Pricing | Fixed-scope itemised quote | Estimate + provisional sums | Verbal price + variations |
| Design & engineering | In-house architect + SE | Outsourced, separate billing | Builder draws on the back of an envelope |
| Planning + LDC handled | Yes — included in price | Often charged extra | Builder asks you to apply |
| Party wall surveyors | Instructed by us | Your responsibility | Skipped (illegal) |
| Building control | Plans + site inspections booked by us | Building Notice route | Not registered |
| Project management | Dedicated PM, weekly photo updates | Foreman doubles up | Owner-manager juggles 5 jobs |
| Payment schedule | Stage payments against signed-off milestones | Weekly invoices | Cash up front |
| Insurance | £10M PL + 10yr structural warranty | £2–5M PL only | No documented cover |
| Snags at handover | <3 typical | 20–30 typical | Walk-off mid-job common |
| Variation creep | 0% — fixed scope | +15–25% over original quote | +40%+ regularly |
Save £33,600–£75,600 on a flat renovation.
Industry data (FMB, RICS, Which? Trusted Trader 2024) shows the average London construction project overruns by 18–22% on cost and 25–35% on time. Fixed-scope contracts with a single accountable team eliminate that variance. The savings above assume a typical project at £168,000.
Want a build like Westminster?
Get a fixed-scope quote with the same direct-labour delivery. Senior consultant call within one business hour.