Ealing · W5 · 2026

1934 mock-Tudor semi — integral garage → bedroom + ensuite + utility (PD route)

Ealing · W5 Pitshanger · 1934 mock-Tudor semi · 7-week build

Project cost
£48,500
Site programme
7 wks
Type
Garage Conversion (integral garage → bedroom + ensuite + utility)
Year
2026

Brief

1934 mock-Tudor semi-detached on Pitshanger Lane W5, owner-occupier family of four with elderly parent moving in. Brief: convert the 17m² integral single garage (used only for bicycle and garden storage for 18 years) into a ground-floor bedroom + ensuite + utility room — adding a self-contained ground-floor sleeping suite for the visiting parent. PD route preferred to minimise programme + risk. Existing front-elevation aesthetic (reclaimed Tendring stock to dado + pebbledash render + integral half-timber) must read unchanged.

Challenge

Five issues. (1) Existing garage slab — unreinforced 75mm Victorian-style concrete poured 1934 over compacted London Clay; insufficient for Part L floor U-value (0.18 W/m²K target) without full re-pour. (2) Front-elevation match — Ealing planning officers + Pitshanger Garden Suburb Society both review PD route garage conversions where front infill is involved; the original 1934 reclaimed Tendring stock brick (to dado) + pebbledash render (above) + integral half-timber detail must be replicated indistinguishably. (3) Floor levels — existing garage slab 220mm below internal hallway level (original 1934 stepped detail for water exclusion); new habitable floor must align with hallway threshold to retain accessible single-storey circulation for elderly user. (4) Soil-pipe routing — no existing soil stack to the garage side of the house; new branch routed through side-return void from rear external stack (existing stack serves first-floor bathroom directly above garage) + new vent through roof. (5) Boiler relocation — existing combi boiler mounted on shared garage/hall partition wall; required relocation to new utility room with new flue route through side elevation (Part J + Part L flue clearance check).

Solution

Pre-application engagement Ealing Planning Service week -8 (Ealing 'Lawful Development Certificate' application £150 fee submitted in parallel for resale clarity — issued week +6). Build 7 weeks. Week 1 strip-out + temporary boiler off + slab break-out + excavation 200mm dig for new floor build-up. Weeks 1–2 new reinforced floor slab — 150mm well-compacted Type 1 + 1200g DPM + 100mm PIR (Celotex GA4000) + 75mm reinforced screed (A142 mesh) U-value 0.16 W/m²K + wet UFH loops (Wunda 16mm pipe centres 150mm). Week 2 internal block-and-render wall liner on existing single-skin garage walls — 50mm cavity + 100mm PIR (Celotex GA4000) + service zone + 12.5mm plasterboard skim — U-value 0.21 W/m²K. Weeks 2–3 front-elevation infill — original 1934 garage door + steel lintel removed + new opening blocked up with reclaimed Tendring stock brick to dado (sourced from Lassco Wandsworth — 1930s reclaimed match identified by Ealing CO via 12-brick sample panel) + pebbledash render above to match (M&S Vellings render with original aggregate sample matched 80:20 Thames sand + 6mm Cornish granite chip) + integral half-timber 100×25mm oak band painted Bulmer 'Tudor Black' to match existing. New 1200mm × 1500mm timber-frame casement window inserted centrally — Mumford & Wood double-glazed slim-sightline 28mm to match original 1934 leaded-light proportions (no leaded-light replication — Ealing CO accepted plain glazed where new). Weeks 3–4 first-fix M&E. New soil-pipe branch routed through side-return cavity via existing first-floor stack route — 110mm uPVC + 75mm vent through roof Part H compliant. New combi boiler installation Worcester Bombardier 25kW in utility room + new horizontal flue through side elevation Part J 600mm clearance from any opening. New 6kW electric heat load + 100A consumer-unit upgrade. Weeks 4–5 internal partitions + ensuite tanking. New 100mm timber stud partition wall separating bedroom from ensuite + utility — 2× 15mm plasterboard + Rockwool RWA45 acoustic + Genie clip-on bars Rw 48dB. Ensuite Schlüter-KERDI tanking system + KERDI-DRAIN linear drain + 600×600mm Carrara marble floor + walls + Burlington traditional thermostatic shower + bespoke single-basin oak vanity + Burlington traditional taps. Weeks 5–6 finishes. Bedroom 14m² engineered oak floor 240mm wide-plank over UFH + Farrow & Ball 'Wevet' walls + Original BTC pendant fittings + bespoke wardrobe wall by Naked Doors. Utility room 4.5m² with Belfast sink + integrated Bosch washer + dryer + Belling integrated dishwasher (for the new bedroom kitchenette use case) + Edward Bulmer 'Pale Hone' walls + Carrara marble worktop + reclaimed quarry-tile floor. New side-access utility door (Builderr-fabricated oak frame + cottage-style double-glazed timber door matching the existing rear cottage door). Week 7 commissioning + air-tightness test (achieved 4.8 m³/h/m² @50Pa against Part L 8.0 target) + LDC issued + snagging + handover.

Outcome

Lawful Development Certificate issued week 6 — confirms front-elevation infill, internal conversion + utility door + flue route all fall within Schedule 2 Part 1 Class A + Class B PD rights (no breach of frontage projection, no breach of cubic capacity, no breach of materials test). Project completed Q2 2026, on programme. Elderly parent moved in week 8. The ground-floor self-contained sleeping suite (14m² bedroom + 3.2m² ensuite + 4.5m² utility/kitchenette) functions as fully accessible single-storey accommodation — level-threshold side access door + level-threshold internal hallway connection + thermostatic shower with grab-rail + lever taps throughout. Front elevation reads indistinguishably from neighbours' 1934 originals — Pitshanger Garden Suburb Society confirmed 'no perceptible change' in pre-completion review. Resale agent (Sinton Andrews Ealing) valued the uplift at £105,000 against £48,500 spend = 117% gross ROI — significant uplift driven by the multigenerational-ready ground-floor suite differentiating from peer 1934 semi stock. Builderr first formally-LDC-certified integral garage conversion + first multigenerational ground-floor suite + first front-elevation Tendring stock + pebbledash + half-timber matched infill with CO 12-brick sample panel approval. Ealing 2nd portfolio case study + Pitshanger Lane first.

Spec

Project specification.

Property
1934 mock-Tudor semi-detached W5 Pitshanger Lane; not in CA + not listed; integral single garage 17m² (4.8m × 3.5m); owner-occupier family of four + visiting elderly parent
Scope
Integral garage → 14m² ground-floor bedroom + 3.2m² ensuite + 4.5m² utility/kitchenette with self-contained side access; PD route + LDC issued
Consent
PD route Schedule 2 Part 1 Class A + Class B (no planning application); Lawful Development Certificate £150 fee issued week 6; Building Notice Building Control route
Floor build-up
Existing 1934 75mm unreinforced slab broken out; 150mm Type 1 + 1200g DPM + 100mm Celotex GA4000 PIR + 75mm reinforced screed A142 mesh + Wunda 16mm wet UFH at 150mm centres; U-value 0.16 W/m²K (target 0.18)
Wall build-up
Internal liner on existing single-skin garage walls: 50mm cavity + 100mm Celotex GA4000 PIR + service zone + 12.5mm plasterboard skim; U-value 0.21 W/m²K (target 0.28)
Front-elevation infill
Original 1934 garage door + steel lintel removed; new opening blocked reclaimed Tendring stock brick to dado (Lassco Wandsworth) + pebbledash render above (M&S Vellings 80:20 Thames sand + 6mm Cornish granite) + integral half-timber 100×25mm oak Bulmer 'Tudor Black'; new 1200×1500mm Mumford & Wood timber casement double-glazed slim 28mm to match original 1934 proportions; Ealing CO 12-brick sample panel approval
Soil-pipe + boiler
New 110mm uPVC soil branch through side-return cavity via existing first-floor stack route + 75mm vent through roof Part H; existing combi boiler relocated to new utility room (Worcester Bombardier 25kW) + new horizontal flue through side elevation Part J 600mm clearance compliant
Ensuite
3.2m² Schlüter-KERDI tanking + KERDI-DRAIN linear drain + 600×600mm Carrara marble floor + walls + Burlington traditional thermostatic shower + bespoke single-basin oak vanity + Burlington traditional taps
Utility/kitchenette
4.5m² Belfast sink + integrated Bosch washer + dryer + Belling integrated dishwasher + Carrara marble worktop + reclaimed quarry-tile floor; functions as ancillary kitchenette for visiting parent
Acoustic + accessibility
Bedroom/ensuite/utility partition Rw 48dB via 2× 15mm plasterboard + Rockwool RWA45 + Genie clip-on bars; level-threshold side access door + level internal hallway connection; thermostatic shower with grab-rail; lever taps throughout
Airtightness
4.8 m³/h/m² @50Pa achieved (Part L 8.0 target) — exceeds Part L by 40%
Cost + ROI
All-in £48,500 build (slab + walls + front infill + ensuite + utility + boiler + electrical + finishes); resale agent uplift £105,000 = 117% gross ROI
Programme
7 weeks build (on programme); 8 weeks total incl LDC; Q2 2026 completion
Recognition
Pitshanger Garden Suburb Society pre-completion review 'no perceptible change' on front elevation

Gallery

Inside the build.

Converted garage bedroom with ensuite door
New 14m² ground-floor bedroom in former integral garage — full Part L upgrade, mock-Tudor front-elevation match
New ensuite carved from utility lobby
New 3.2m² ensuite carved off circulation lobby — Burlington traditional brassware + Bert & May floor tile
Utility room with new side access
Utility room 4.5m² with new side access door + integrated Bosch washer/dryer + boiler relocation + Belfast sink
Front elevation matched mock-Tudor brick + render
Front-elevation infill matched to existing — reclaimed Tendring stock brick to dado + pebbledash render above + integral half-timber detail

"My mother needed a self-contained ground-floor flat-equivalent within our family home — bedroom, ensuite, kitchenette, and a level-threshold door from the side path so she could come and go independently. Two contractors said it would need full planning + a building line check + 12 weeks of design work. Builderr walked the front elevation and identified the PD route on day one — Class A + Class B with the Lawful Development Certificate for resale comfort. The Tendring stock brick + pebbledash + half-timber match was the moment we knew — they brought 12 reclaimed brick samples + a render aggregate sample to the Pitshanger Society review meeting before submission. Seven weeks on programme. Airtightness 4.8 against 8.0 target — the new bedroom is warmer than the rest of the 1934 house. £105k uplift on £48.5k spend."

Anjali & Mark P., Pitshanger Lane W5

Compare

Builderr vs other London builders.

The construction industry has a wide distribution of operators. Here's what changes between a directly-employed, fixed-scope outfit and the alternatives.

Builderr fixed price
£48,500
a garage conversion (integral garage → bedroom + ensuite + utility) · no provisional sums
Typical builder + variations
£58,200
+£9,700 vs Builderr (≈20% overrun)
Cowboy outfit + cost creep
£70,325
+£21,825 vs Builderr (≈45% overrun)
CriterionBuilderrTypical London builderCowboy outfit
Labour modelDirectly employed team (PAYE)Mixed subcontract gangsDay-rate cash labour
PricingFixed-scope itemised quoteEstimate + provisional sumsVerbal price + variations
Design & engineeringIn-house architect + SEOutsourced, separate billingBuilder draws on the back of an envelope
Planning + LDC handledYes — included in priceOften charged extraBuilder asks you to apply
Party wall surveyorsInstructed by usYour responsibilitySkipped (illegal)
Building controlPlans + site inspections booked by usBuilding Notice routeNot registered
Project managementDedicated PM, weekly photo updatesForeman doubles upOwner-manager juggles 5 jobs
Payment scheduleStage payments against signed-off milestonesWeekly invoicesCash up front
Insurance£10M PL + 10yr structural warranty£2–5M PL onlyNo documented cover
Snags at handover<3 typical20–30 typicalWalk-off mid-job common
Variation creep0% — fixed scope+15–25% over original quote+40%+ regularly
Bottom line

Save £9,700£21,825 on a garage conversion (integral garage → bedroom + ensuite + utility).

Industry data (FMB, RICS, Which? Trusted Trader 2024) shows the average London construction project overruns by 18–22% on cost and 25–35% on time. Fixed-scope contracts with a single accountable team eliminate that variance. The savings above assume a typical project at £48,500.