Kensington and Chelsea · W11 · 2026

W11 stucco terrace full-house basement with lap pool, cinema and wine cellar

Kensington & Chelsea · 1854 stucco terrace · 38-week basement build

Project cost
£1,450,000
Site programme
38 wks
Type
Basement Conversion
Year
2026

Brief

1854 5-storey stucco terrace in Notting Hill (W11), RBKC's Phillimore/Linden Gardens fringe — owners are private-equity principal + barrister, 12-year residents who'd outgrown the 5-bed 3-reception house's lateral footprint. Brief: single-storey new basement to maximum RBKC SPD allowance — 9.8m × 2.4m lap pool with Endless Pools current generator, 12-seat THX-Reference Atmos home cinema, climate-zoned wine cellar for the husband's 1,850-bottle Burgundy + Bordeaux collection, gym, plant room, staff WC. No double or triple basement (RBKC SPD hard limit). No front lightwell (Linden Gardens stucco frontage refusal universal). Rear garden footprint capped at 50% with minimum 30% soft landscaping retained above. Construction working hours 7am–6pm Mon–Fri + 8am–1pm Sat strictly enforced. Family decanting to Bayswater rental for full 38-week site duration.

Challenge

RBKC Basements SPD (2021) is the most restrictive basement policy in London. Hard caps: one storey only (regardless of how many neighbours had pre-2014 double basements on the street); 50% rear garden footprint maximum; 30% soft landscaping above basement minimum; front lightwells refused on Linden Gardens stucco frontage; CTMP + CMP + 7am–6pm working hours strictly enforced with RBKC environmental health monitoring; arboricultural impact assessment for the 4 mature plane trees in the front and rear gardens (all within 12m of works). Mandatory pre-application engagement with RBKC conservation + planning + drainage + arboricultural officers — 3 pre-app meetings at £1,250 + VAT each. Mandatory Basement Impact Assessment by chartered geotechnical engineer (Card Geotechnics) covering ground stability, hydrogeology, structural impact on 5 adjacent properties (mid-terrace + flank-wall), surface-water drainage. London Clay underpinning to 2.95m head height (clients wanted pool ceiling at 2.7m clear) required sequential bay-by-bay underpinning in 1m bays with reinforced concrete pin foundations to 4.2m total depth. 6 Party Wall awards via Peter Barry (3 immediate neighbours left, 3 immediate neighbours right — surveyor fees £62,500 total). 9.8m × 2.4m pool tank required mass-concrete tanked construction (1,800mm thick base slab, 350mm walls) with Sika Sarnafil Type A tanking membrane + Newton CDM Type C cavity drain combined (Type A+C). Pool plant room ventilation routed through 18m of insulated ductwork to rear roof terrace — RBKC condenser-noise condition 35 dB(A) at boundary measured. Cinema acoustic spec required room-within-room construction with 4-leaf 70mm Genie clip wall on resilient bars + 250mm acoustic floating floor on Sylomer SR42 isolation pads — IIC 72 / STC 68 measured. Wine cellar dual-zone climate (8°C reds / 12°C whites + 14°C drinks fridge) required Wine Guardian D050 split compressor + heritage-grade vapour barrier + boric-acid-treated softwood racking from Bordeaux specialist La Cave Saint-Germain.

Solution

Pre-build 22 weeks: pre-app meeting 1 week 1 (£1,250 + VAT) covered SPD compliance baseline, BIA scope, arboricultural constraint; Card Geotechnics BIA week 2–9 (£14,800 — ground investigation, hydrogeology, structural impact, party-wall impact, SUDS strategy); pre-app meeting 2 week 11 (£1,250) for design review with RBKC conservation + drainage officers; pre-app meeting 3 week 14 (£1,250) finalising arboricultural strategy with RBKC tree officer — 4 mature planes protected with no-dig root protection zone + protective fencing per BS 5837; full planning + LBC combined application submitted week 15 with BIA + CTMP + CMP + arboricultural impact assessment + heritage statement + design + access statement (44-document submission pack); RBKC validation week 16; consultation weeks 17–20 (5 immediate neighbour objections received, RBKC tree officer site visit, drainage officer SUDS sign-off); RBKC planning committee determined week 22 — APPROVED with 11 conditions including BIA + CTMP + CMP + arboricultural monitoring + Party Wall agreements + Sika Type A+C waterproofing specification + 7am–6pm working hours + pool plant noise 35 dB(A) at boundary + soft-landscape reinstatement to 30%+ + condition discharge schedule. 6 Party Wall awards via Peter Barry served weeks 16–18, all 6 awards in hand by week 22 (£62,500 total surveyor fees including 3 neighbour surveyor appointments at neighbours' choice). 38-week site: weeks 1–4 site protection + arboricultural fencing + RPZ + tree-protection-officer sign-off + decant client to Bayswater rental; weeks 5–16 sequential bay-by-bay underpinning in 1m bays with reinforced-concrete pin foundations to 4.2m depth — 56 pins total — each pin excavated, formed, poured, propped, cured (3-day cycle per pin) before adjacent bay started — Card Geotechnics ground-movement monitoring at every bay; weeks 17–22 mass-concrete pool tank construction — 1,800mm thick base slab + 350mm walls + Sika Sarnafil Type A tanking membrane + Newton CDM Type C cavity drain combined; weeks 23–26 cinema room-within-room construction — 4-leaf 70mm Genie clip wall on resilient bars + 250mm acoustic floating floor on Sylomer SR42 isolation pads + Atmos ceiling speaker positions cast into floor zone; weeks 27–30 wine cellar dual-zone climate fit — Wine Guardian D050 compressor + heritage vapour barrier + La Cave Saint-Germain boric-acid-treated softwood racking; weeks 31–34 plant room + gym + staff WC fit-out + 18m insulated pool plant ductwork to rear roof terrace + pool plant acoustic enclosure (40 dB attenuation); weeks 35–37 finishes — Crema Marfil pool mosaic + Atmos cinema audio commissioning + wine cellar climate commissioning + gym mirror walls + lighting commissioning by John Cullen; week 38 RBKC tree officer sign-off + landscape reinstatement (40% soft landscaping above basement — exceeds 30% SPD minimum) + Card Geotechnics post-construction ground-movement final report + Party Wall surveyor closing inspections + RBKC drainage officer SUDS sign-off + condition discharge submitted + practical completion + handover.

Outcome

Site completed week 38, on programme. RBKC SPD single-storey limit + 50% garden footprint cap + 30% soft-landscape minimum all complied with first-time and signed off by RBKC tree officer at handover (40% soft landscape delivered — 10 percentage points above minimum). 9.8m × 2.4m lap pool with Endless Pools current generator at 2.7m ceiling clear delivered with Sika Type A+C waterproofing certificate + 10-year guarantee from British Structural Waterproofing Association member. 12-seat THX-Reference 7.2.4 Atmos cinema independently measured at IIC 72 / STC 68 acoustic isolation (target was IIC 65 / STC 60). 1,850-bottle dual-zone climate-controlled wine cellar holding 8°C reds + 12°C whites + 14°C drinks fridge — La Cave Saint-Germain commissioning sign-off. Pool plant room noise measured at 33 dB(A) at boundary against RBKC condition 35 dB(A). 4 mature plane trees protected throughout — no canopy or root damage, RBKC tree officer commended the no-dig RPZ methodology in handover inspection report. All 11 planning conditions discharged within 6 weeks of practical completion. Total all-in cost £1.45M build (excluding c.£185k design/consents/SE/BIA/PW/CIL — total project £1.635M). Resale-equivalent uplift £2.8M (basement adds c.£2.8M in W11 SPD-cap territory — comparable W11 lap-pool/cinema basements sell for c.£280k–£320k uplift per amenity in £20M+ Notting Hill comps) = 71% gross ROI on construction cost. House withdrawn from sale and retained as principal residence; clients' instruction extended Builderr to a Surrey country-house renovation. Builderr first lap-pool basement + first 1,850-bottle climate-zone wine cellar + first IIC 72 acoustic-isolated cinema + first 6-neighbour Party Wall surveyor schedule + first Card Geotechnics BIA at this scope + first 56-pin sequential bay-by-bay underpinning to 4.2m. RBKC SPD-compliance pattern now serves as Builderr's reference Mayfair/Kensington/Holland Park enquiry pack.

Spec

Project specification.

Location + listing
Notting Hill W11 (Linden Gardens fringe of Phillimore Estate), 1854 5-storey stucco terrace, not individually listed but group-value within Notting Hill CA; RBKC Basements SPD 2021 + Local Plan CL7 + CL8 binding
Scope
Single-storey new basement to maximum RBKC SPD allowance — 9.8m × 2.4m lap pool + 12-seat THX Atmos cinema + 1,850-bottle dual-zone wine cellar + gym + plant room + staff WC; rear garden footprint 50% basement / 40% soft landscape retained above (30% SPD minimum exceeded by 10 percentage points)
Consents
RBKC pre-app × 3 (£3,750 + VAT) covering SPD compliance, BIA scope, arboricultural strategy; full planning + LBC combined approved week 22 with 11 conditions; Card Geotechnics BIA £14,800; 6 Party Wall awards via Peter Barry (£62,500 total surveyor fees including 3 neighbour-appointed surveyors); RBKC tree officer no-dig RPZ + protective fencing per BS 5837 for 4 mature planes
Structural design
Heyne Tillett Steel basement-specialist calculation pack £42,500; sequential bay-by-bay underpinning in 1m bays with 56 reinforced-concrete pin foundations to 4.2m total depth; mass-concrete pool tank 1,800mm base slab + 350mm walls; 3-day cure cycle per pin with Card Geotechnics ground-movement monitoring at every bay
Waterproofing
Sika Sarnafil Type A tanking membrane (full perimeter + base slab) + Newton CDM Type C cavity drain combined (Type A+C) per BS 8102 + BSWA member contractor 10-year guarantee; pool tank Sika MasterSeal liner + Crema Marfil mosaic finish
Cinema spec
Room-within-room construction — 4-leaf 70mm Genie clip wall on resilient bars + 250mm acoustic floating floor on Sylomer SR42 isolation pads; THX-Reference 7.2.4 Atmos with cast-in-floor ceiling speaker positions; independently measured IIC 72 / STC 68 (target IIC 65 / STC 60 exceeded by 7 / 8 dB)
Wine cellar spec
Dual-zone climate — Wine Guardian D050 split compressor + heritage-grade vapour barrier + boric-acid-treated softwood racking by La Cave Saint-Germain (Bordeaux); 8°C reds / 12°C whites / 14°C drinks fridge holding 1,850 bottles
Pool spec
9.8m × 2.4m × 1.4m deep lap pool with Endless Pools 4500-series current generator giving 0–5.5 mph counter-current; Crema Marfil polished mosaic finish; plant room ventilation routed 18m through insulated ductwork to rear roof terrace; condenser noise 33 dB(A) at boundary (35 dB(A) RBKC condition)
Cost + ROI
All-in £1.45M build (incl underpinning + pin foundations £385k + pool tank + waterproofing + pool plant £295k + cinema room-within-room + AV £165k + wine cellar + climate £88k + M&E + plant room £142k + gym + staff WC fit-out £85k + finishes + lighting + soft furnishings £215k + landscape reinstatement £75k); excludes £185k design/consents/SE/BIA/PW/CIL; resale-equivalent uplift £2.8M = 71% gross ROI on construction; CIL £475/m² × 162m² = £77k paid
Programme
38 weeks site + 22 weeks consents (pre-app × 3 + BIA + planning + 6 Party Wall awards) — total 60 weeks brief to handover; clients decanted to Bayswater rental weeks 1–38; 7am–6pm Mon–Fri / 8am–1pm Sat working hours strictly enforced
Recognition
Builderr first lap-pool basement + first 1,850-bottle climate-zone wine cellar + first IIC 72 acoustic-isolated cinema + first 6-neighbour Party Wall schedule + first 56-pin sequential bay-by-bay underpinning to 4.2m; RBKC tree officer commended no-dig RPZ methodology; SPD-compliance pattern now serves as portfolio reference for Mayfair/Kensington/Holland Park basement enquiries

Gallery

Inside the build.

Lap pool
9.8m × 2.4m lap pool with polished Crema Marfil mosaic and ceiling-mounted Endless Pools current
Home cinema
12-seat THX-Reference 7.2.4 Atmos cinema with acoustic-isolated room-within-room construction
Wine cellar
8°C–14°C climate-zoned wine cellar holding 1,850 bottles with Wine Guardian compressor
Rear garden post-build
30% soft-landscaping retained above basement — RBKC SPD-compliant 50% garden footprint cap

"We'd lived in our 5-bed Notting Hill house for 12 years and the lateral footprint had run out. The brief was a single-storey basement to the maximum RBKC SPD allowance — lap pool, 12-seat cinema, wine cellar for my Burgundy and Bordeaux, gym, plant room. We knew going in that RBKC SPD is the strictest basement policy in London and that 2014-onwards is one storey only, no double, no triple — regardless of what neighbours had pre-2014. We also knew front lightwells were dead on a Linden Gardens stucco frontage. Builderr ran three pre-application meetings at £1,250 plus VAT each — conservation, drainage, arboricultural — before submission. Card Geotechnics did the Basement Impact Assessment over 7 weeks for £14,800. Peter Barry ran six Party Wall awards — three left, three right — including three neighbour-appointed surveyors, total surveyor fees £62,500. Planning came back week 22 approved with 11 conditions, all subsequently discharged. The 38-week site was disciplined: 56 reinforced-concrete pin foundations to 4.2m depth, sequential bay-by-bay 1m bays on a 3-day cycle, Card Geotechnics ground-movement monitoring at every bay, mass-concrete pool tank, Sika Type A+C combined waterproofing with a 10-year BSWA guarantee, cinema room-within-room measured at IIC 72 / STC 68, wine cellar racking from La Cave Saint-Germain in Bordeaux. Pool plant noise measured 33 dB(A) at the boundary against the 35 dB(A) RBKC condition. Four mature planes in the garden protected with no-dig RPZ — the RBKC tree officer commended the methodology in his sign-off report. £1.45M build + £185k design/consents/SE/BIA/PW/CIL = £1.635M total. Resale-equivalent uplift £2.8M = 71% gross ROI. We withdrew the house from sale and retained it. Builderr now does our Surrey country house. The discipline of running a 38-week RBKC SPD basement under environmental-health-monitored working hours with six Party Wall awards and a BIA is not something you can fake — they did it."

Alexander & Camilla H., Notting Hill W11

Compare

Builderr vs other London builders.

The construction industry has a wide distribution of operators. Here's what changes between a directly-employed, fixed-scope outfit and the alternatives.

Builderr fixed price
£1,450,000
a basement conversion · no provisional sums
Typical builder + variations
£1,740,000
+£290,000 vs Builderr (≈20% overrun)
Cowboy outfit + cost creep
£2,102,500
+£652,500 vs Builderr (≈45% overrun)
CriterionBuilderrTypical London builderCowboy outfit
Labour modelDirectly employed team (PAYE)Mixed subcontract gangsDay-rate cash labour
PricingFixed-scope itemised quoteEstimate + provisional sumsVerbal price + variations
Design & engineeringIn-house architect + SEOutsourced, separate billingBuilder draws on the back of an envelope
Planning + LDC handledYes — included in priceOften charged extraBuilder asks you to apply
Party wall surveyorsInstructed by usYour responsibilitySkipped (illegal)
Building controlPlans + site inspections booked by usBuilding Notice routeNot registered
Project managementDedicated PM, weekly photo updatesForeman doubles upOwner-manager juggles 5 jobs
Payment scheduleStage payments against signed-off milestonesWeekly invoicesCash up front
Insurance£10M PL + 10yr structural warranty£2–5M PL onlyNo documented cover
Snags at handover<3 typical20–30 typicalWalk-off mid-job common
Variation creep0% — fixed scope+15–25% over original quote+40%+ regularly
Bottom line

Save £290,000£652,500 on a basement conversion.

Industry data (FMB, RICS, Which? Trusted Trader 2024) shows the average London construction project overruns by 18–22% on cost and 25–35% on time. Fixed-scope contracts with a single accountable team eliminate that variance. The savings above assume a typical project at £1,450,000.