RICS Home Survey Standard 2021
RICS replaced previous survey nomenclature (Homebuyer Report, Building Survey) with three standardised Levels in 2021. Level 1 Condition Report: shortest visual survey, traffic-light condition rating (1/2/3) on building elements + services, suitable for newer property in apparent good condition, no valuation, no advice on repairs. Cost £350–£650 for typical London 3-bed. Level 2 HomeBuyer Report: includes Level 1 plus more detail on defects, market valuation, reinstatement cost for insurance, follow-up advice. Most commonly purchased for conventional property in apparent fair condition. Cost £650–£1,250. Level 3 Building Survey: most comprehensive RICS survey — full visual inspection, defects analysis, repair recommendations, often estimated repair costs, suitable for older/listed/altered/poor-condition property. Cost £950–£2,500.
Specialist + structural surveys
Specific Defect Survey: focused investigation of identified defect (subsidence cracks, damp pattern, roof failure) — surveyor or structural engineer depending on defect type. Output: cause diagnosis + repair recommendations + cost estimate. Useful when Level 2/3 survey flags concern requiring follow-up. Cost £450–£1,850. Structural Engineer's Report (vs surveyor's): qualified Chartered Structural Engineer (IStructE/ICE MIStructE/MICE) — specifically for structural questions: subsidence assessment, crack monitoring + cause analysis, alteration feasibility, foundation adequacy, beam/lintel design verification, party wall structural assessment. Cost £450–£2,850 depending on scope. Engineer's Report carries more weight than surveyor's report for structural lender/insurance questions.
Which to commission when
Purchase of typical post-1960s house, no obvious issues, modern construction: Level 1 or 2 sufficient. Purchase of Victorian/Edwardian terrace, period property, or showing any defect indicators: Level 3 Building Survey — period property complexity warrants comprehensive coverage. Specific concern flagged on prior survey or visual: Specific Defect Survey + Structural Engineer's Report as appropriate. Pre-renovation structural feasibility (can I add loft + extension + remove walls?): Structural Engineer's Report scoping feasibility + likely structural costs. Pre-listing seller's survey (to anticipate buyer queries): Level 3 + remediation any flagged defects pre-marketing. Builderr renovation context: most clients have done Level 2/3 survey at purchase — review report at design stage, commission targeted structural engineer's input where renovation scope intersects with flagged defects.
