Skip to content
ProjectsCost GuidesGuidesAnswersInsightsAbout
Get a Quote

Greenwich · SE3 · SE7 · SE9

Full House Renovations in Greenwich

South-east borough mixing Georgian terraces and post-war semis — varied planning constraints. Whole-home refurbishments handled by one team: structural, MEP, joinery and finishes.

Typical Greenwich cost
£80k–£400k
Timeline
1636 weeks

Postcodes covered

SE3SE7SE9SE10SE18
Build estimator

Get a 60-second estimate

Indicative range
£45,000£120,000
814 weeks on site

Quick answer

Builderr delivers full house renovations across Greenwich — SE3, SE7, SE9, SE10, SE18 and SE28. Typical Greenwich renovation cost £2,000–£4,200 per square metre over 14–32 weeks. West Greenwich and Blackheath CAs hold significant Georgian and early Victorian stock — heritage spec includes Mumford & Wood sash restoration or replacement, NHL 3.5 lime mortar repointing, Hayles & Howe cornice work and reinstated original chimneypieces. Maritime Greenwich World Heritage Site (Greenwich Park, ORNC, Cutty Sark) and its 1.5km buffer zone require Heritage Statement and View Impact Analysis on any external alteration visible across the river — Historic England and ICOMOS consultation common. Heritage spec lands at £2,800–£4,200/m² (SE3 Blackheath, SE10 West Greenwich); contemporary Charlton, Eltham and SE18 stock delivers at £2,000–£2,700/m² with PD-friendly route and stronger ROI on 1930s/post-war modernisation.

Maritime Greenwich WHS protected view corridors restrict roof alterations within ~2.5km of Greenwich Park north-south axis. Blackheath joint CA (with Lewisham) committee review on borders. Greenwich CIL Zone B £30/m² (low) but Mayoral CIL applies at £25–£50/m². Pre-app £180–£480 strongly advised for WHS buffer projects.

Greenwich

Full House Renovations specialists across Greenwich.

We deliver full house renovations projects across the full Greenwich postcode set — SE3, SE7, SE9, SE10, SE18. South-east borough mixing Georgian terraces and post-war semis — varied planning constraints.

Every Greenwich project includes a free desk-based planning assessment before we quote, so you know upfront whether permitted development, prior approval, or full planning applies to your specific address. Our local project manager for Greenwich has detailed knowledge of the planning department's preferences, the conservation area boundaries, and the common construction details for the prevailing housing stock here.

Quotes for Greenwich full house renovations are fixed-scope after a site survey, valid for 60 days, and never carry provisional sums or open-ended day rates. Every project includes our 10-year structural warranty and 12-month defects period.

Planning in Greenwich

Local planning rules for full house renovations in Greenwich.

Greenwich's conservation areas include West Greenwich, East Greenwich, Westcombe Park (Blackheath), Charlton Village and Eltham. The Maritime Greenwich UNESCO World Heritage Site adds an extra layer of planning sensitivity. The council's Local Plan is design-focused; planners insist on matching materials and traditional detailing in heritage areas. Modern rear extensions can be approved if they read as secondary to the host building. Pre-application consultation is recommended for any extension or roof addition.

Our planning team handles the full submission for Greenwich addresses including drawings, Design and Access Statements where required, and pre-application consultation with the council. We tell you whether your full house renovation is permitted development, prior approval, or full planning before you sign anything.

Compare

Builderr vs other London builders.

The construction industry has a wide distribution of operators. Here's what changes between a directly-employed, fixed-scope outfit and the alternatives.

Builderr fixed price
£240,000
a full house renovation in Greenwich · no provisional sums
Typical builder + variations
£288,000
+£48,000 vs Builderr (≈20% overrun)
Cowboy outfit + cost creep
£348,000
+£108,000 vs Builderr (≈45% overrun)
CriterionBuilderrTypical London builderCowboy outfit
Labour modelDirectly employed team (PAYE)Mixed subcontract gangsDay-rate cash labour
PricingFixed-scope itemised quoteEstimate + provisional sumsVerbal price + variations
Design & engineeringIn-house architect + SEOutsourced, separate billingBuilder draws on the back of an envelope
Planning + LDC handledYes — included in priceOften charged extraBuilder asks you to apply
Party wall surveyorsInstructed by usYour responsibilitySkipped (illegal)
Building controlPlans + site inspections booked by usBuilding Notice routeNot registered
Project managementDedicated PM, weekly photo updatesForeman doubles upOwner-manager juggles 5 jobs
Payment scheduleStage payments against signed-off milestonesWeekly invoicesCash up front
Insurance£10M PL + 10yr structural warranty£2–5M PL onlyNo documented cover
Snags at handover<3 typical20–30 typicalWalk-off mid-job common
Variation creep0% — fixed scope+15–25% over original quote+40%+ regularly
Bottom line

Save £48,000£108,000 on a full house renovation in Greenwich.

Industry data (FMB, RICS, Which? Trusted Trader 2024) shows the average London construction project overruns by 18–22% on cost and 25–35% on time. Fixed-scope contracts with a single accountable team eliminate that variance. The savings above assume a typical project at £240,000.

FAQ

Full House Renovations in Greenwich.

How much does a full house renovation cost in Greenwich?

+

Most full house renovations projects in Greenwich cost £80,000–£400,000 depending on size, spec and structural complexity. Inner London postcodes typically sit toward the upper end; outer borough projects trend mid-range. All Builderr Greenwich quotes are fixed-price with no provisional sums.

Do I need planning permission for a full house renovation in Greenwich?

+

Planning rules vary across Greenwich. We check permitted development eligibility, conservation area status and any Article 4 directions affecting your specific postcode before quoting. Many full house renovations fall under permitted development, but conservation areas and listed buildings need full planning.

How long does a full house renovation take in Greenwich?

+

Typical timeline is 16–36 weeks on site, plus 4–8 weeks for design, structural engineering and approvals. If full planning is required (conservation areas, mansards, larger extensions), add 8–12 weeks for the planning decision before site start.

Do you have full house renovation references in Greenwich?

+

Yes — we maintain a live reference list for Greenwich and can connect you with two or three completed clients within the borough. We've delivered projects across nearly every Greenwich postcode since 2022, so most prospective clients can visit a completed project nearby.

What's included in a Builderr full house renovation quote in Greenwich?

+

Every Greenwich quote covers structural design, party wall notices and surveyor coordination, planning or prior approval submission where required, building control, full build, snagging and a 10-year structural warranty. Kitchen units, sanitaryware and bespoke finishes are itemised separately so you can flex spec without losing fixed-price certainty on the build.

Get a Greenwich full house renovation quote.

Senior consultant call within one business hour. Free desk-based planning assessment for SE3, SE7, SE9 and surrounding postcodes. Fixed-scope price — no provisional sums.